Operations >> Process & Plants

Process & Plants
 
Mission Statement
Conditioning, treating and processing of raw natural gas/oil to obtain marketable products i.e. fuel gas, stabilized oil, motor spirit, kerosene, diesel, LPG & sulphur through processing plants via optimum safe & environment friendly process plants operation and maintenance
 
Objectives
Well fluids are often a complex mixture of liquid hydrocarbons, gas and some impurities. It is necessary to remove liquid hydrocarbons & objectionable impurities from natural gas before the gas is supplied to the buyer. 
The separation/purification of natural gas, liquid hydrocarbons and removal of impurities is accomplished by various processes such as gas dehydration, gas sweetening, dew point control, LPG/condensate fractionation, liquid recovery etc. depending upon the composition of the well stream and the desired specifications of the end products.
 

OGDCL PROCESS PLANTS RESUME

Plant

Products

Design / Installed Capacity

Start-up Date

Qadirpur Gas Processing Plant

Gas sweetening through membrane technology.

 

Phase-I

 

Phase-II (Extension)

 

Phase-III (Extension)

 

 

 

Sales Gas
Condensate

Sales Gas
Condensate

Sales Gas

 

 

 

235 MMSCFD (prev.)
300 BPD (Prev.)

500 MMSCFD (prev.)
900 BPD

600 MMSCFD

 

 

 

1995

 

2004

 

2009

Uch Gas Processing Plants

Gas Sweetening though MDEA process for low heating value gas for power generation

 

Uch-I Plant

Uch-II Plant

 

 

 

 

Sales Gas

Sales Gas

 

 

 

 

250 MMSCFD

250 MMSCFD

 

 

 

 

1999

2015

KPD Gas Processing Plant – Amine sweetening, Mole sieve Dehydration, LPG Recovery, condensate stabilization. Compression

 

Sales gas Condensate/NGL

LPG

 

204 MMSCFD
5200 BPD

413 MT/D

 

2012

Nashpa Gas Plant

Gas dehydration plant, Condensation stabilization

 

Phase-I

 

Phase-II (ext.)

Phase-III (ext.)

 

 

 

Sales Gas

Condensate

Sales Gas

Sales Gas

Condensate

 

 

 

50  MMSCFD (Prev.)
14500 BPD (Prev.)

90 MMSCFD (Prev.)

140 MMSCFD

2,3000 BPD

 

 

 

2010

 

2012

2016

Dakhni Gas / Condensate Processing Plant

Gas sweetening through Amine process, Dehydration, LPG and Sulphur Recovery

 

Gas Sweetening and Dehydration – train I


 

 

Gas Dehydration unit – train II

 

 

 

 

Sales Gas
Condensate
LPG
Sulphur

Sales Gas

 

 

 

 

36 MMSCFD
1,760 BPD
26 MT/D
157 MT/D

50 MMSCFD

 

 

 

 

1989

 

 

2008

Chanda Gas / Condensate Processing Plant 

Gas dehydration, LPG recovery and condensate stabilization

 

Sales Gas
LPG
Condensate

 

40 MMSCFD
54 MT/D
5,300 BPD

 

2004

Sinjhoro Gas Processing Plant

Dehydration, Gas sweetening through membrane technology, LPG Recovery, Condensate stabilization, Compression

 

Sales Gas
LPG

Condensate

 

27 MMSCFD
128 MT/D

2,463 BPD

 

2012

Bobi Gas / Condensate Processing Plant 

Gas dehydration, LPG recovery and condensate stabilization,

 

Sales Gas
LPG
Condensate

 

16 MMSCFD
120 MT/D
2,762 BPD

 

2004

Pirkoh / Loti Gas Processing Plants

Compression of low pressure gas and dehydration

 

Pirkoh Plant

Loti Plant

 

 

 

Sales Gas(Pirkoh)

Sales Gas(Loti)

 

 

 

50 MMSCFD

50 MMSCFD

 

 

 

1987-88

Mela Gas Dehydration Plant

Gas Dehydration, condensate stabilization

 

Sales Gas
Condensate

 

30 MMSCFD
14,500 BPD

 

2007

Daru Plant

Gas processing through membrane technology and dehydration

 

Sales Gas

 

20 MMSCFD

 

2010

Hundi Sari Gas Plant

Gas Compression and dehydration

 

Sales Gas

 

20 MMSCFD

 

1975

Dhodak Gas Processing Plant

Gas Dehydration

 

Sales Gas

 

10 MMSCFD

 

2010

Nur / Bagla Plant

Membrane separation, Compression

 

Sales Gas
Condensate

 

10  MMSCFD
150 BPD

 

2013

Kunnar LPG Plant

Gas dehydration, LPG Recovery, Condensate stabilization, Gas Reinjection

 

Sales Gas
Condensate

LPG

 

10  MMSCFD
3,885 BPD

40 MT/D

 

2013