Last 10 Years Projects

Mela Development in KPK at Karak KPK

In order to arrest depleting pressure and to enhance production, o3 Front-end Engine driven Reciprocating compressors have been installed at Mela Plant. To recover 30 MTPD LPG from the compressed gas at NASHPA Plant, Raw Gas has been transported by laying of 22 KM pipeline from Mela to Nashpa Plant. ...

NASHPA Compression Project at Karak KPK

In order to arrest depleting production and pressure, 03 Engine driven Reciprocating compressors trains have been installed. ...

NASHPA Gas Processing at Karak KPK

In order to recover LPG from Raw Gas and Condensate,  the Plant has been installed with Molecular sieve dehydration, Condensate stabilization including Turbo expander for LPG recovery with daily capacity to produce 18,500 BBLs of oil, 90-100 MMSCFD Sales Gas, 350 MT of LPG and 1,100 BBLs of NGL ...

Maru Reti Compression Project at Ghotki Sindh

Reciprocating Engine Driven Compressor has been installed to enhance the production and to operate at minimum suction pressure of 50 psig to meet the GSA volume of Gas 11-12 MMSCFD to buyer M/s Engro Fertilizers. ...

Qadirpur Compression Project at Ghotki Sindh

In order to arrest pressure decline and to enhance production, existing 03 Centrifugal Compressors were replaced by installation of new Compressors operating up to 70 psig suction pressure for ultimate recovery of the reservoir. ...

Sinjhoro Gas Project at Sanghar Sindh Province

The Gas Processing & LPG units were re-located from existing Fields to Sinjhoro Filed. The Sinjhoro Gas Project has a daily production of Gas 30-40 MMSCFD, Oil 3300 BBL and LPG 170 M,Ton. ...

UCH-II Gas Processing Project at Dera Bughti Baluchistan

Project has design capacity to treat 300 MMSCFD Raw Gas with Sales Gas of 160 MMSCFD  supplied to UPL for the production of 404 MW Electricity, with two trains of Amine and Dehydration units, having processing capacity of 150 MMSCFD each train. ...

KPD-TAY Integrated Gas processing Project at Hyderabad Sindh

Project has design capacity to treat 250 MMSCFD Raw Gas which yields to Pipeline quality Natural Gas 225 MMSCFD, LPG 350 M.Ton/Day and Oil 3500 BBLs/Day with two trains of Amine Sweetening and Glycol Dehydration units, LPG extraction and Allied Utilities etc. ...