Projects

Khewari Development Project, District Khairpur, Sindh
Khewari Development Project scope included installation of gathering, separation facility at wellhead and transportation of 10 MMscfd raw gas through 16 KM pipeline to process at Sinjhoro Field. Project completed in mere 06 months and sale gas is being delivered to buyers as per allocation by GoP si ...

ZIN Development Project, District Dera Bughti, Baluchistan
ZIN Block is in vicinity of OGDCL’s UCH Gas Processing Plant with a potential of +/- 108 MMscfd low btu gas. Different options are underway to monetize/ commercialize the field. Negotiations are underway with M/s UCH Power Ltd.
...
Bettani Development Project, District Lakki Marwat, Khyber Pakhtunkhwa
OGDCL has recently installed Bettani Early Production Facility (EPF) under Extended Well Testing (EWT) arrangement which is presently processing 13 MMscfd raw gas. Bettani Block has the potential to produce 90 MMSCFD raw gas with 3,500-4,000 BBLS condensate with LPG & NGL contents. OGDCL has eng ...

Mela Development in KPK at Karak KPK
In order to arrest depleting pressure and to enhance production, 03 Front-End Engine driven Reciprocating compressors have been installed at Mela Plant to recover 30 MTPD LPG from the compressed gas at NASHPA Plant, Raw Gas is being transported by laying of 22 KM pipeline from Mela to Nashpa Plant.
...

NASHPA Compression Project at Karak KPK
In order to arrest depleting production and pressure, 03 Frond-End Engine driven Reciprocating compressors trains having design capacity of 105 MMscfd were installed resulted in incremental production of 5.5~6 MMscfd Sales Gas, 1,500 bbl Oil, 100 bbl NGL & 20 Mton LPG.
...

NASHPA Gas Processing at Karak KPK
In order to recover LPG from Raw Gas and Condensate, the Plant has been installed with Molecular sieve dehydration, Condensate stabilization including Turbo expander for LPG recovery with daily capacity to produce 18,500 BBLs of oil, 90-100 MMSCFD Sales Gas, 350 MT of LPG and 1,100 BBLs of NGL ...

Maru Reti Compression Project at Ghotki Sindh
Reciprocating Engine Driven Compressor has been installed to enhance the production and to operate at minimum suction pressure of 50 psig to meet the GSA volume of Gas 11-12 MMSCFD to buyer M/s Engro Fertilizers.
...

Qadirpur Compression Project at Ghotki Sindh
In order to arrest pressure, decline and to enhance production, existing 03 Centrifugal Compressors were replaced by installation of new Compressors operating up to 70 psig suction pressure for ultimate recovery of the reservoir.
...

Sinjhoro Gas Project at Sanghar Sindh Province
The Gas Processing & LPG units were re-located from existing Fields to Sinjhoro Field. The Sinjhoro Gas Project has a daily production of Gas 30-40 MMSCF, Oil 3300 BBL and 170 MTPD LPG.
...

UCH-II Gas Processing Project at Dera Bughti Baluchistan
Project has design capacity to treat 300 MMSCFD Raw Gas with Sales Gas of 160 MMSCFD being supplied to UPL for the production of 404 MW Electricity, with two trains of Amine and Dehydration units and allied Utilities having processing capacity of 150 MMSCFD each train.
...

KPD-TAY Integrated Gas processing Project at Hyderabad Sindh
Project has design capacity to treat 250 MMSCFD Raw Gas which yields to Pipeline quality Natural Gas of 225 MMSCFD, Oil 3500 BBLs/Day and 350 MTPD LPG with two trains of Amine Sweetening and Glycol Dehydration units, LPG extraction and Allied Utilities etc..
...

Jhal Magsi Gas Processing Project District Jhal Magsi Baluchistan
OGDCL is installing a Gas Processing Plant comprising of separation system, Glycol Dehydration & Amine Sweetening Unit alongwith allied Utilities. It will produce Pipeline Quality Natural Gas of 13.7 MMSCFD. Gas will be injected into the SSGCL system through 98 km pipeline. As per the planned ti ...

Re-Location of Kunar LPG Plant at Daru-Mangrio Processing Facility Sindh
OGDCL intends to install Kunnar LPG Plant along with Allied Utilities at Daru Central Facility in order to cater the recovery of LPG in comingled Feed Streams from (Chuttu, Daru, Mangrio 1&2 Wells). Production yield upon completion will be LPG 22 to 26 M.Ton Daily. Currently Project in Tendering ...

KPD-TAY Compression in Tando Jam, Hyderabad, Sindh
To cater the pressure depletion and to optimize production from depleting wells, Front-End/ Nodal Compression will be installed at KPD-TAY Fields. The Contract has been awarded on EPCC (Engineering, Procurement, Construction and Commissioning) basis.
The project is planned to complete by Apri ...

Dakhni Compression in Jand, District Attock, Punjab
To cater the pressure depletion and to optimize production from depleting wells, Front-End Compression will be installed at Dakhni Fields. The Contract has been awarded on EPCC (Engineering, Procurement, Construction and Commissioning) basis.
The project is planned to complete by January 2026.
& ...

UCH Compression Project District Dera Murad Jamali, Baluchistan
OGDCL intends to install Front-end Compression to meet GSA obligations with UPL (UCH Power Ltd.) at UCH Gas Field. The Contract has been awarded on EPCC (Engineering, Procurement, Construction and Commissioning) basis.
The project is planned to complete by June, 2026.
...